Set the exit criteria before the run starts: matching asset counts, matching open finding counts, and an agreed tolerance on band changes. A parallel run with no criteria drifts into a second production system.

Kenna remains supported to June 30, 2028 under the bulletin, so an overlap is possible without breaking the contract, but check the term end and the notice period first.

A sourced example

Nucleus's Kenna page, last modified 2026-08-25, says it maps current connectors and workflows, runs Nucleus in parallel with Kenna to validate results, then cuts over.